11. How can I get a missing street sign or other traffic sign replaced?

 
Once Engineering receives a report about a missing sign, a representative will be sent to the location to verify the request. If a sign is found to be missing, a work order will be issued for replacement. Stop signs and similar traffic control signs will be replaced as soon as possible. Other signs usually take 3-6 weeks to replace.