PBC logo


Public Affairs
Department


P.O. Box 1989
West Palm Beach, FL 33402-1989
(561) 355-2754
FAX: (561) 355-3819
http://www.pbcgov.com
PBC dot
Palm Beach County
Board of County
Commissioners


Priscilla A. Taylor
Mayor

Paulette Burdick
Vice Mayor

Hal R. Valeche

Shelley Vana

Steven L. Abrams

Mary Lou Berger

Jess R. Santamaria


County Administrator

Robert Weisman



"An equal opportunity
Affirmative Action Employer"


Electronic Press Release



print Print Document
City of West Palm Beach Road Construction Information
The link above provides daily road construction updates for the City of West Palm Beach. For more information dial 822-4636.
Information is also available on-line at
www.smartraveler.com
These free services are provided by FDOT and the SunGuide™ Partners. For updated lane closure information, please refer to
www.pbfdot.com

PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF
ROAD AND BRIDGE CONSTRUCTION LIST

DATE OF ISSUE:  July 23, 2014

STATUS FOR JULY 28, 2014 THROUGH AUGUST 3, 2014


***  CONSTRUCTION WORK ZONES ADDED OR CHANGED  ***

***  SINCE LAST REPORT  ***


1. LOCATION:         Woolbright Road from Military Trail to west of Congress Avenue (City of Boynton Beach)

DESCRIPTION:       Installation of a 36” water main.

RESTRICTIONS:    All lanes are now open.


2. LOCATION:         Seminole Pratt Whitney Road from south of Okeechobee Boulevard to Sycamore Drive (West of the Town of Loxahatchee Groves)

DESCRIPTION:       Asphalt Paving.

RESTRICTIONS:    There will be lane closures.


3. LOCATION:         Military Trail and Belvedere Road (Town of Haverhill)

DESCRIPTION:       Replace the mast arm on the southeast corner.

RESTRICTIONS:    There will be delays with lane closures beginning Tuesday, July 29, 2014, from 8:00 pm through 6:00 am on Wednesday, July 30, 2014. Police will be present to assist.


4. LOCATION:         Hood Road west of Alternate A1A and Frenchman’s Crossing (City of Palm Beach Gardens)

DESCRIPTION:       Installation of a new traffic signal.

RESTRICTIONS:    The traffic signal will be activated on Thursday, July 31, 2014.  There are message boards to warn the motorists.


***   UNCHANGED CONSTRUCTION WORK ZONES   ***


5. LOCATION:         Sansburys Way from SR 80 to Belvedere Road (West of the City of West Palm Beach)

DESCRIPTION:       Underground utilities.

RESTRICTION:      No lane closures are planned.


6. LOCATION:         Seminole Pratt Whitney Road from 60th Street North to south of Orange Boulevard (The Acreage)

DESCRIPTION:       Rebuilding the roadway from a 2 lane to a 4 lane divided roadway.

RESTRICTIONS:    The northbound traffic has been switched to the final configuration.  The southbound traffic will remain in one lane for median work.


7. LOCATION:         Le Chalet Boulevard from Jog Road to Military Trail (West of the City of Boynton Beach)

DESCRIPTION:       Milling and Paving.

RESTRICTIONS:    This is a 4-lane divided highway. One lane will be closed at a time.


8. LOCATION:         Old Dixie Highway from NE 20th Street to Yamato Road (City of Boca Raton)

DESCRIPTION:       Pavement markings and reflective pavement markers.

RESTRICTIONS:    No lane closures are planned.


9. LOCATION:         Seton Avenue from Chukker Drive to Summit Boulevard (North of the Village of Palm Springs)

DESCRIPTION:       Replace existing pipe, roadway and guardrail.

RESTRICTIONS:    Seton Avenue will be closed to all traffic beginning Monday, July 7, 2014, through Thursday, July 31, 2014. Traffic will be detoured via Summit Boulevard, Kirk Road and Chukker Drive.


10. LOCATION:       Miner Road from Military Trail to Old Military Trail
                                   
                                    Old Military Trail from Miner Road to Military Trail (West of the City of Boynton Beach)

DESCRIPTION:       Rebuilding the roadway and utility work.

RESTRICTIONS:    All lanes are open.


11. LOCATION:       Kirk Road from Vicliff Road to Cypress Lane (Village of Palm Springs)

DESCRIPTION:       Remove Bridge and construct a box culvert.

RESTRICTIONS:    Kirk Road was closed at 6:00 AM on Monday, June 9, 2014, and should reopen at 6:00 PM on Sunday, August 17, 2014. Traffic will be detoured via Purdy Lane, Military Trail and 10th Avenue North. Pedestrians will not be affected.


12. LOCATION:       Flagler Memorial Bridge over the Intracoastal Waterway (City of West Palm Beach and Town of Palm Beach)

DESCRIPTION:       Construction of a new bridge by the FDOT.

RESTRICTIONS:    The Bridge is closed to all vehicle and pedestrian traffic. The Bridge is scheduled to reopen on Saturday, November 1, 2014. Traffic will be detoured via the Royal Park Bridge.


13. LOCATION:       Congress Avenue from Hypoluxo Road to Donnelly Drive (West of the Town of Lantana)

DESCRIPTION:       Construction of utilities, curb, gutter, and sidewalk with ADA consideration. This work is being done for southbound traffic only.

RESTRICTIONS:    There will be alternating right and left through lane closures.


14. LOCATION:       Cherry Road from Quail Drive to Tallahassee Drive (West of the City of West Palm Beach)

DESCRIPTION:       Reconstruction of roadway.

RESTRICTIONS:    No lane closures are planned.


15. LOCATION:       Hatton Highway Bridge between SR 80 and SR 700 (East of the City of Belle Glade)

DESCRIPTION:       Bridge removal and construction of a new bridge.

RESTRICTIONS:    Hatton Highway will be closed to all traffic from Tuesday, April 1, 2014, through Tuesday, September 30, 2014. Traffic will be detoured via SR 80 and SR 700.


16. LOCATION:       A1A at Carlin Park (Town of Jupiter)

DESCRIPTION:       Bridge removal and construction of a new bridge.

RESTRICTIONS:    A1A will be closed to all traffic between the north and middle entrances of Carlin Park from Tuesday, April 1, 2014, through July 2014. Traffic will be detoured via Indiantown Road, US1, Marcinski Road, and A1A.


Provided and Maintained by Public Affairs.
Tel: 561-355-2754  Fax: 561-355-3819
301 N. Olive Avenue, Suite 1102, P.O. Box 1989
West Palm Beach, FL 33402-1989