Palm Beach County Logo, link to home page
 
Palm Tran Meetings  Marketing  External Links  Staff Portal Site Map
 

Directory

 
 

Route Changes

 
Changes to Routes 4, 41, 45, 60 and The Bolt: Effective 5/3/15. New schedules are posted as "Beginning May 3, 2015" on each route's page that has a change.
Click here for details
Attention Palm Tran Route 41 Southbound Riders: Detour Effective 4/6/15 - 11/25/15
Route 41
Southbound only from N. Ocean Rd: Right on Tradewind Dr, Left on N. Lake Way/Country Club Rd, Right on N. County Rd and back to regular route.

Thank you for your cooperation
Attention Palm Tran Route 31 Riders: Detour effective approximately 4/21/15 - 5/21/15. Due to road construction in West Palm Beach, Palm Tran will use the following detour:
Route 31
Southbound from Australian Ave: Left on 15th Street, Right on Tamarind Ave and back on route.
Northbound from Tamarind Ave: Left on 15th Street, Right on 25th Street and back on route.

Thank you for your cooperation
Attention Palm Tran Riders: Routes 31 and 33 will detour in West Palm Beach due to road construction. Road closures will take place on Australian Ave and 36th Street.
Route 31
Southbound only will detour approximately Monday, March 16, 2015 through Saturday, April 20, 2015 as follows: Australian Ave southbound to Left on 25th Street, and back on route. The bus stops located on the Northbound side of Route 31 (Electronics Way) that will NOT be in service are, #3019, 3020, 3021, and 3057. During this detour, Route 31 will use bus stops #1424 and 1425 on Australian Ave Southbound.
Route 33
Northbound only only will detour approximately Monday, March 16, 2015 through Sunday, March 22, 2015 as follows: Right on 25th St, Left on Electronics Way, Left on 36th St, Right on Australian, and back on route. Route 33 bus stops located on Northbound Australian Ave that will NOT be in service are 1417, 1418, and 1419, between 25th & 36th Streets. Route 33 Northbound will use the Electronics Way bus stop (same as on the Route 31).

Thank you for your cooperation
Bus Stop #319 Relocation
Route 1 northbound: Effective 1-19-15, Bus Stop #319 located at the northeast corner of Boynton Beach Boulevard and Federal Hwy has been permanently RELOCATED to the southeast corner. A new bus shelter has been built at this location and Route 1 northbound will now use this new bus stop location.
Bus Stop Temporarily Closed
Bus Stop #1059 located at the northwest corner of Military Trail and 10th Avenue in Lake Worth is temporarily CLOSED due to construction on the bus shelter. Route 3 southbound will NOT access this bus stop until construction is finished. Thank you for your cooperation.
Route 1
Effective January 11, 2015
two additional buses will be dedicated to this route on weekdays. This will result in additional running time which will assist in keeping buses on schedule and improve overall route performance. Click here to view the new Route 1 weekday schedule.

Route 40
Effective January 11, 2015
several changes will be made to the limited-stop Route 40 which will begin to offer all day service on weekdays between Belle Glade, Wellington, and West Palm Beach via SR 80. In order to streamline the route, two of the four trips between Belle Glade and Pahokee with the lowest ridership were eliminated, as well as an extra loop of downtown West Palm Beach. The route will begin in the Glades and end at the Intermodal Transit Center in Downtown West Palm Beach, where passengers can connect to several other Palm Tran routes and Tri-Rail. These routing changes, plus additional running time added to the schedule, will improve the route's on time-performance and efficiency. Click here to view the new Route 40 weekday schedule and map.
Route 31
Attention Palm Tran Route 31 Riders, on Wednesday, December 17, 2014, this route will resume regular routing and will NO LONGER be on a detour. Road construction will no longer impact this route. The one exception is the southbound bus stop #49 at Tamarind Ave and 7th Street, which CANNOT be accessed at this time and had been temporarily removed. After the construction is complete, the bus stop will be returned. Thank you for your cooperation.